Skip to content Skip to left sidebar Skip to footer

North Fork Kings GSA to perform a canal capacity study

North Fork Kings GSA is performing a canal capacity study during the 2023-24 fiscal year to identify where potential improvements can be made to the canal and conveyance systems within the agency. The study will allow surface water units within the North Fork GSA to deliver as much available Kings River water as possible for irrigation and recharge to help comply with the Sustainable Groundwater Management Act (SGMA).

The study will gather information to estimate the existing canal capacity and constraints of existing conveyance systems through site visits and discussions with existing operations staff. Following the study, a second phase consisting of a more detailed survey of needed improvements and preliminary design of the highest priority systems may be conducted to help estimate the costs of the improvements and determine participation between North Fork Kings GSA and the applicable surface water unit.

By performing this study, North Fork Kings GSA aims to increase the capacity of the systems to bring more surface water in to offset groundwater pumping and conduct groundwater recharge.

The canal capacity study will be shared with irrigation districts and the mutual water companies within the North Fork Kings so they can quickly identify where to invest in improvements.

Translate »